When Q4 volumes spike, leaders need a KPI that reflects true unit economics—not a pretty average. Two metrics dominate the conversation: Cost-Per-Order (CPO) and Cost-Per-Case (CPC). Both matter, but they answer different questions. This guide clarifies what each measures, how to calculate them, and which one you should trust when carts get bigger, lines get longer, and labor gets tight.
Cost-Per-Order (CPO)
Your total costs to process and fulfill an order—labor, materials, overhead—divided by total orders in the period. In practice, many teams treat it as a fulfillment KPI within the broader order-to-cash family.
Cost-Per-Case (CPC)
Your total warehouse operating cost allocated to cases handled (received, picked, packed, loaded), divided by the number of cases in the period. CPC appears in industry practice as “per-case” cost views used in DC spend analysis.
Related: Industry bodies like APQC and CSCMP place CPO within order management/fulfillment measures across plan-source-make-deliver-return, underscoring its cross-functional nature.
CPO = (All fulfillment/order-processing costs for the period) ÷ (Number of customer orders)
CPC = (Total warehouse operating costs for the period) ÷ (Total cases handled)
(Practitioners often allocate by activity—receiving, picking, packing, shipping—before dividing by cases.)
Scenario | Use CPO | Use CPC |
---|---|---|
Multi-line, multi-unit orders (holiday baskets with many cases) | ⚠️ Can understate true unit cost as order size grows | ✅ Normalizes to workload—more cases = higher denominator |
Comparing channel economics (DTC vs. wholesale orders) | ✅ Captures full order handling cost | ⚠️ Misses non-warehouse costs outside the DC |
Labor planning inside the DC (staffing, pay-for-performance) | ⚠️ Too coarse; orders vary wildly in size | ✅ Direct tie to cases-per-hour, dock turns |
Executive financial roll-ups (order-to-cash) | ✅ Aligns to finance benchmarks | ⚠️ Can mask line-level inefficiency during peaks |
Bottom line: In peak season, average CPO can look “flat” while CPC quietly climbs as order lines and units per order surge. That’s why DC practitioners pair them—and lean on CPC to manage the floor. Industry KPI lists reinforce tracking both, but use each in the right context.
Week 1: 10,000 orders / 25,000 cases → CPO looks fine; CPC = costs ÷ 25,000
Week 2 (promotions): 10,000 orders / 35,000 cases → CPO barely moves, but CPC rises because labor per case (travel, picks, QC) increases.
Conclusion: If you only watch CPO, you’ll miss the unit cost creep that erodes margin.
Track both CPO and CPC, but staff to CPC (cases and cases-per-hour drive labor).
Layer orders-per-labor-hour (or orders picked per hour) to watch mix effects at the order level.
Keep a DC metrics backbone (WERC “DC Measures” family) so you’re not optimizing one KPI at the expense of others (on-time ship, order accuracy, dock dwell).
Build two simple denominators in your dashboard:
Allocate warehouse operating cost weekly (labor, MHE, supplies) to a “CPC pool.”
Show a split chart: CPO (finance lens) vs. CPC (operations lens) over identical time windows so mix effects jump off the page.
Trigger rules: If CPC rises >5% week-over-week but CPO is flat, investigate: slotting, pick path, overtime mix, or returns congestion.
Q1: Which KPI should I show my CFO?
Show both—CPO for order-level economics in the order-to-cash cycle, CPC for DC labor efficiency. Pairing them prevents false comfort from order averages.
Q2: How does SKU proliferation affect the choice?
More lines per order raises handling touches per case; CPC will reveal the cost pressure sooner than CPO. Industry KPI frameworks recommend tracking multiple warehouse and logistics cost lenses.
Q3: Can I benchmark these externally?
Yes—finance teams often benchmark order-to-cash and CPO via APQC; DC teams align with WERC/DC Measures for warehouse performance comparisons.
Q4: What if our operation is pallet/case-heavy wholesale?
Lean on CPC as your north star; it aligns with cases-per-hour, dock turns, and pick productivity more directly than CPO.
Q5: Should I include inventory carrying cost in CPO or CPC?
Carry costs typically sit in broader warehousing/logistics cost views, not just fulfillment; keep them visible in roll-ups and separate diagnostics.
👇📅 We're here to help. There's no pitch - just a conversation. 📅👇